×

Please be informed that Building Services – Ancillary Building Engineering Division will be carrying out the Genset ON Load Test at FCZ Building, KLIA from Sunday, 19 December 2021 (1000hrs until 1700hrs). No Normal Supply within 1 hour and Essential Power Supply will be available after 10 seconds.

Cyberjaya, 2 December 2021 – Dagang NeXchange Berhad (“DNeX”) is well-positioned for further growth as it benefits from the greater demand for semiconductor chips as well as the positive outlook for upstream oil production resulting from higher oil prices in a post-COVID 19 environment.

Please be informed that Myanmar have successfully rectified the technical issues, and ASEAN Member States (AMS) may now resume the exchange of the ATIGA e-Form D to/or from Myanmar (for port of Yangon and Thilawa).

Cyberjaya, 29 November 2021 – SilTerra Malaysia Sdn Bhd has entered into a multi-year wafer supply and purchase agreement with ILI Technology Corp (“Ilitek”), a leading touch controller and driver integrated circuit (“IC”) fabless design house based in Taiwan.

Cyberjaya, 26 November 2021 – Dagang NeXchange Berhad (“DNeX”) has announced a strong set of financial results for the first quarter ended 30 September 2021 (“1Q FY2022”).

Reference is made to the above subject, to inform on the new deployment for MAQIS DVS & SPB and iMAQIS.

The deployment of the above will be as per the following schedule (4th December 2021, Saturday)

Please be informed that Myanmar is currently facing technical difficulties in implementing technical and security upgrades in ASEAN Single Window (ASW) Gateway, which caused Myanmar could not exchange ATIGA e-Form D to/or from ASEAN Member State (AMS). As a result, ATIGA Form D transmitted electronically to Myanmar could not be exchanged and will remain at exporting country’s gateway.

This is to inform that there will be system maintenance activity taking place in Malaysia’s ASW environment which will result to Malaysia’s ASW Gateway being temporarily down on 2nd to 3rd December 2021 (Thursday – Friday) at (Malaysia Time), Thursday, 03.00 pm – Friday, 10.00 am.

NOTICE ON SIRIM E-COMM SYSTEM MAINTENANCE

Reference is made to the attached announcement from the SIRIM QAS International Sdn Bhd (SQASI).

Please be informed that SIRIM e-ComM system will be unavailable from : Friday, 19th November 2021 (2100hours) until Sunday, 21st November (2100hours).

TOP