×

Ref No: DNT/K3/20220803-001

Dear Valued Customers,

Warmest greetings from Dagang Net Technologies Sdn Bhd.

NOTIFICATION: VEHICLE DECLARATIONS IN K3

With reference to the above subject, following are the information that we received from the Royal Malaysian Customs Department (RMCD) personnel:

1. For K3 declarations involving vehicles, the current procedure is that 1 (one) vehicle per 1 (one) K3 declaration. This is due to the requirement for K3 information to be channelled to Road Transport Department Malaysia (JPJ) for monitoring purposes.

2. However, there is an allowance for declarations of multiple vehicles in 1 (one) K3 declaration for vehicle, specifically for manufacturers with unregistered vehicles, for the usage of Excise 7 only.

Should you require more information & technical assistance, please reach out to our Careline at 1 300 133 133 or email careline@dagangnet.com

Thank You

Latest News

Get updates and announcements from Dagang Net

View All

Read more +13 June 2025

ANNOUNCEMENT: IMPLEMENTATION OF NEW CONTROL MECHANISM FOR THE IMPORTATION OF WASTE PLASTIC (HS CODE 3915)

Please be informed that effective from 1 July 2025, the control mechanism for the importation of waste plastic (HS Code 3915) will shift from the issuance of Approved Permits by JPSPN to the Certificate of Approval (CoA) mechanism issued by SIRIM, as appointed by the Ministry of Investment, Trade and Industry (MITI).
Read more +11 June 2025

NOTIFICATION: SYSTEM DOWNTIME FOR ATIGA APPLICATIONS ON MALAYSIA’S ASEAN SINGLE WINDOW (ASW) GATEWAY DUE TO TECHNICAL DISRUPTION

Please be informed that due to a technical issue with Malaysia’s ASEAN Single Window (ASW) Gateway, the transmission and receipt of electronic Form D (e-Form D) under the ASEAN Trade in Goods Agreement (ATIGA) has been disrupted since 8 June 2025.
Read more +11 June 2025

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 15th June 2025, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.
TOP