×

Ref No: NSW/DNT/20220223-003

Dear Valued Customers,

Warmest greetings from Dagang Net Technologies Sdn Bhd.

NOTIFICATION : NEW FEATURES TO SUBMIT ENGINE CAPACITY FOR ELECTRIC VEHICLES IN ALL CUSTOMS DECLARATION MODULES (K1, K2, K3, K8 & K9).

The earlier notice on the above from Dagang Net (Ref No: NSW/DNT/20220223-002) referred.

Please be informed that the features to cater for the declarations as above will be available on the 15th March 2022 (Tuesday).

For ALDEC users, you may start to download the latest ALDEC version on 15th March 2022 at http://sda.dagangnet.net/aldec/. For those who are using the front end system provided by Dagang Net’s business partners, you can check with your respective supplier for the latest version of the front end.

Should you require more information & technical assistance, please reach out to our Careline at 1 300 133 133 or email careline@dagangnet.com.

Thank You.


Ref No: NSW/DNT/20220223-002

Dear Valued Customers,

Warmest greetings from Dagang Net Technologies Sdn Bhd.

NOTIFICATION: IMPLEMENTATION OF NEW CARGO CLASS FOR ELECTRIC VEHICLES IN ALL CUSTOMS DECLARATION MODULES (K1, K2, K3, K8 & K9).

The earlier notice on the above from Dagang Net on 29 October 2021 referred.

Attach is the email from Royal Malaysian Customs Department (BTM) where the submission of new Cargo Class Type for electric vehicle from the front end system to the Sistem Maklumat Kastam (SMK) is effective 15th March 2022 (Tuesday).

Should you require more information & technical assistance, please reach out to our Careline at 1 300 133 133 or email careline@dagangnet.com.

Thank You.

Attachment:

Email from Royal Malaysian Customs Department (BTM)


Date: 29 October 2021

Ref No: NSW/DNT/20211029-001

Dear Valued Customers,

Warmest greetings from Dagang Net Technologies Sdn Bhd.

UPDATE: NOTIFICATION : NEW ADDITIONAL CARGO CLASS CODE AND IMPLEMENTATION OF ENGINE CAPACITY (IN KWT) FOR ELECTRIC VEHICLE IN ALL CUSTOMS DECLARATION MODULES (K1, K2, K3, K8 & K9)

Notice from the Royal Malaysian Customs Department (RMCD), Ref No KE.HK(-)145/09-1Klt.24 (12) as per the attachment is referred.

RMCD is introducing a new Cargo Class type for Customs declarations involving electric vehicle/motor cycle. Details of the new Cargo Class type is as per the table below:

Code Type
Code
Description

Cargo Class

C

Electric Vehicle / Motor Cycle

Please check with your respective front end solution provider for the changes to be ready before the implementation date, to be announced by RMCD at later date.

Should you require more information, please reach out to our Careline at 1 300 133 133 or email careline@dagangnet.com.

Thank You.

Attachment

Announcement from the Ministry of International Trade and Industry (MITI)

Latest News

Get updates and announcements from Dagang Net

View All

Read more +13 June 2025

ANNOUNCEMENT: IMPLEMENTATION OF NEW CONTROL MECHANISM FOR THE IMPORTATION OF WASTE PLASTIC (HS CODE 3915)

Please be informed that effective from 1 July 2025, the control mechanism for the importation of waste plastic (HS Code 3915) will shift from the issuance of Approved Permits by JPSPN to the Certificate of Approval (CoA) mechanism issued by SIRIM, as appointed by the Ministry of Investment, Trade and Industry (MITI).
Read more +11 June 2025

NOTIFICATION: SYSTEM DOWNTIME FOR ATIGA APPLICATIONS ON MALAYSIA’S ASEAN SINGLE WINDOW (ASW) GATEWAY DUE TO TECHNICAL DISRUPTION

Please be informed that due to a technical issue with Malaysia’s ASEAN Single Window (ASW) Gateway, the transmission and receipt of electronic Form D (e-Form D) under the ASEAN Trade in Goods Agreement (ATIGA) has been disrupted since 8 June 2025.
Read more +11 June 2025

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 15th June 2025, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.
TOP