×

Ref No: NSW/EPCO/210401-01

Dear Valued Customers,

Warmest greetings from Dagang Net Technologies Sdn Bhd.

NOTIFICATION - SURVEY ON RULES OF ORIGIN (ROO) IN THE ASEAN TRADE IN GOODS AGREEMENT (ATIGA)

Please be informed that the ASEAN Secretariat is conducting a survey for the purposes of understanding the private sector’s views on the stringency of ATIGA Rules of Origin, particularly the product-specific rules (PSRs), and assessing how the cost and burden of applying for paper-based/electronic Certificates of Origin (COs) Form D, or making use of the ASEAN-wide Self-Certification (AWSC) Scheme affect the private sector.

The survey will be closed on 22 April 2021. Please click the link below to go to the survey web site, or copy and paste the link into your Internet Browser.

https://forms.gle/iMJkRi8Zx21wmAFA9

Should you require more information, please reach out to our Careline at 1 300 133 133 or email careline@dagangnet.com

Thank You

Latest News

Get updates and announcements from Dagang Net

View All

Read more +13 June 2025

ANNOUNCEMENT: IMPLEMENTATION OF NEW CONTROL MECHANISM FOR THE IMPORTATION OF WASTE PLASTIC (HS CODE 3915)

Please be informed that effective from 1 July 2025, the control mechanism for the importation of waste plastic (HS Code 3915) will shift from the issuance of Approved Permits by JPSPN to the Certificate of Approval (CoA) mechanism issued by SIRIM, as appointed by the Ministry of Investment, Trade and Industry (MITI).
Read more +11 June 2025

NOTIFICATION: SYSTEM DOWNTIME FOR ATIGA APPLICATIONS ON MALAYSIA’S ASEAN SINGLE WINDOW (ASW) GATEWAY DUE TO TECHNICAL DISRUPTION

Please be informed that due to a technical issue with Malaysia’s ASEAN Single Window (ASW) Gateway, the transmission and receipt of electronic Form D (e-Form D) under the ASEAN Trade in Goods Agreement (ATIGA) has been disrupted since 8 June 2025.
Read more +11 June 2025

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 15th June 2025, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.
TOP