×

Ref No: DNT/MAB/20250612-001

Dear Valued Customers,

Warmest greetings from Dagang Net Technologies Sdn Bhd.

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 15th June 2025, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.

For further information, please refer to the attached circular from Cargo Management FCZ.

Should you require further clarification or assistance, please do not hesitate to contact our Careline at 1 300 133 133 or via email at careline@dagangnet.com.

Thank You

 

Circular from Cargo Management FCZ

Latest News

Get updates and announcements from Dagang Net

View All

Read more +11 June 2025

NOTIFICATION: SYSTEM DOWNTIME FOR ATIGA APPLICATIONS ON MALAYSIA’S ASEAN SINGLE WINDOW (ASW) GATEWAY DUE TO TECHNICAL DISRUPTION

Please be informed that due to a technical issue with Malaysia’s ASEAN Single Window (ASW) Gateway, the transmission and receipt of electronic Form D (e-Form D) under the ASEAN Trade in Goods Agreement (ATIGA) has been disrupted since 8 June 2025.
Read more +11 June 2025

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 15th June 2025, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.
Read more +06 June 2025

CORRECTION NOTICE: UPDATE OF THE TARIFF RATES FOR EXPANSION OF THE SALES AND SERVICE TAX (SST) SCOPE

Please be advised of the previous announcement dated 3rd June 2025, Reference No: DNT/NSW/RMCD/20250603-002. Kindly take note of the following: 1. The attached PDF in the above-mentioned announcement should be ignored. 2. The contents of that announcement are not valid and should not be circulated. 3. Please refer to the latest announcement dated 5th June 2025 for the most accurate and updated information. 4. Any parties who have distributed or published the previous announcement are requested to declare its invalidity and remove it from all channels or portals immediately.
TOP