ANNOUNCEMENT: IMPLEMENTATION OF ‘ATIGA E-FORM D INSIDE THE COMMON HEADER’ LIVE OPERATION

Reference made to the above subject.

We wish to inform you on the implementation of live operation of ATIGA e-Form D inside the Common Header to all Asean Member Countries on 28th April 2025 at 00.00 (GMT+7).

The following table details the deployment activities to take place for:

i. EPCO-ATIGA SYSTEM
ii. EXCHANGE HUB SYSTEM

During this period, all incoming messages from ASW will be queued for processing. Normal operation of the gateway shall resume once the exercise completed.

To minimize disruption to your business operations, you are advised to:

1. Plan your activities and transactions in advance.
2. Avoid any activities or submissions within two (2) hours prior to the activity. No application will be processed starting this cut off time.

Should you require further clarification or assistance, please do not hesitate to contact our Careline at 1 300 133 133 or via email at careline@dagangnet.com

Thank You

Latest News

Get updates and announcements from Dagang Net

View All

Read more +13 June 2025

ANNOUNCEMENT: IMPLEMENTATION OF NEW CONTROL MECHANISM FOR THE IMPORTATION OF WASTE PLASTIC (HS CODE 3915)

Please be informed that effective from 1 July 2025, the control mechanism for the importation of waste plastic (HS Code 3915) will shift from the issuance of Approved Permits by JPSPN to the Certificate of Approval (CoA) mechanism issued by SIRIM, as appointed by the Ministry of Investment, Trade and Industry (MITI).
Read more +11 June 2025

NOTIFICATION: SYSTEM DOWNTIME FOR ATIGA APPLICATIONS ON MALAYSIA’S ASEAN SINGLE WINDOW (ASW) GATEWAY DUE TO TECHNICAL DISRUPTION

Please be informed that due to a technical issue with Malaysia’s ASEAN Single Window (ASW) Gateway, the transmission and receipt of electronic Form D (e-Form D) under the ASEAN Trade in Goods Agreement (ATIGA) has been disrupted since 8 June 2025.
Read more +11 June 2025

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 15th June 2025, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.
TOP