×

Ref No: DNT/ASW/MAINT/20201207-01

Dear Valued Customers,

Warmest greetings from Dagang Net Technologies Sdn Bhd.

NOTIFICATION : SCHEDULE DOWNTIME FOR SINGAPORE’S ASEAN SINGLE WINDOW (ASW) GATEWAY

This is to inform that there will be system maintenance activity taking place in Singapore’s ASW environment which will result to Singapore’s ASW Gateway being temporarily down during the following date and time:

Date Time (Malaysia Time)
9th December 2020 (Wednesday) 09.30 am - 15.30 pm

 

During this period, Singapore will not be able to send and receive ATIGA e-Form Ds and its related responses. Normal operation of the gateway shall resume once the maintenance exercise completed.

Should you require more information, please reach out to our Careline at 1 300 133 133 or email careline@dagangnet.com.

Thank You

Latest News

Get updates and announcements from Dagang Net

View All

Read more +13 June 2025

ANNOUNCEMENT: IMPLEMENTATION OF NEW CONTROL MECHANISM FOR THE IMPORTATION OF WASTE PLASTIC (HS CODE 3915)

Please be informed that effective from 1 July 2025, the control mechanism for the importation of waste plastic (HS Code 3915) will shift from the issuance of Approved Permits by JPSPN to the Certificate of Approval (CoA) mechanism issued by SIRIM, as appointed by the Ministry of Investment, Trade and Industry (MITI).
Read more +11 June 2025

NOTIFICATION: SYSTEM DOWNTIME FOR ATIGA APPLICATIONS ON MALAYSIA’S ASEAN SINGLE WINDOW (ASW) GATEWAY DUE TO TECHNICAL DISRUPTION

Please be informed that due to a technical issue with Malaysia’s ASEAN Single Window (ASW) Gateway, the transmission and receipt of electronic Form D (e-Form D) under the ASEAN Trade in Goods Agreement (ATIGA) has been disrupted since 8 June 2025.
Read more +11 June 2025

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 15th June 2025, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.
TOP