×

Dear Valued Customers,

Warmest greetings from Dagang Net Technologies Sdn Bhd.

NOTIFICATION ON IMPLEMENTATION OF PRODUCT SPECIFIC RULES (PSR) IN HS 2017 FOR ASEAN-KOREA FREE TRADE AREA (AKFTA)

Reference is made to the Implementation of the Product Specific Rules (PSR) in HS 2017 for ASEAN-Korea Free Trade Area (AKFTA) from Ministry of International Trade And Industry (MITI).

We are pleased to inform that the implementation of Product Specific Rules (PSR) in HS 2017 for ASEAN-Korea Free Trade Area (AKFTA) has taken into effect beginning 1 January 2020. In line with this development; please be informed that all Cost Analysis (CA) application submitted from 1 January 2020 onwards will be evaluated under PSR in HS 2017.

For information on PSR AKFTA in HS 2017, please refer to the attachment.

For further details, please contact our Careline at 1 300 133 133 or email to careline@dagangnet.com.

Thank You

Attachment:

FINAL ePCO Notification 2020 - Implementation of PSR in HS 2017 for AKFTA

 

AKFTA PSR in HS 2017

 

Latest News

Get updates and announcements from Dagang Net

View All

Read more +13 June 2025

ANNOUNCEMENT: IMPLEMENTATION OF NEW CONTROL MECHANISM FOR THE IMPORTATION OF WASTE PLASTIC (HS CODE 3915)

Please be informed that effective from 1 July 2025, the control mechanism for the importation of waste plastic (HS Code 3915) will shift from the issuance of Approved Permits by JPSPN to the Certificate of Approval (CoA) mechanism issued by SIRIM, as appointed by the Ministry of Investment, Trade and Industry (MITI).
Read more +11 June 2025

NOTIFICATION: SYSTEM DOWNTIME FOR ATIGA APPLICATIONS ON MALAYSIA’S ASEAN SINGLE WINDOW (ASW) GATEWAY DUE TO TECHNICAL DISRUPTION

Please be informed that due to a technical issue with Malaysia’s ASEAN Single Window (ASW) Gateway, the transmission and receipt of electronic Form D (e-Form D) under the ASEAN Trade in Goods Agreement (ATIGA) has been disrupted since 8 June 2025.
Read more +11 June 2025

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 15th June 2025, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.
TOP