NOTIFICATION OF SYSTEM DOWNTIME FOR PORT KLANG AUTHORITY

With reference to the attached email regarding the announcement from the Port Klang Authority (PKA), please be informed that PKA will perform the following activities:

Please note, the eDCFZ system will be unavailable during the above period. To reduce business disruption, avoid any Dangerous Cargo/Free Zone transactions two (2) hours before the scheduled downtime.

Should you require more information & technical assistance, please reach out to our Careline at 1 300 133 133 or email careline@dagangnet.com.

Thank You

 

Attachment:

Announcement from the Port Klang Authority (PKA),

 

Latest News

Get updates and announcements from Dagang Net

View All

Read more +03 July 2026

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 5th July 2026, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.
Read more +16 June 2026

NOTIFICATION OF SYSTEM DOWNTIME: MALAYSIA MARITIME SINGLE WINDOW (MMSW)

Please be informed that Dagang Net Technologies Sdn. Bhd. will be carrying out a deployment and maintenance activity for the Malaysia Maritime Single Window (MMSW) system. The table below summarizes the scheduled downtime: Date: Friday, 19th June 2026 – Saturday, 20th June 2026 Time: 11:00 pm - 2:00 am Duration: 3 hours Affected Communities/Transactions: Malaysia Maritime Single Window (MMSW)
Read more +14 June 2026

RESUMPTION OF SERVICE: EDCFZ

Please be informed that the EDCFZ system maintenance has been completed. All related ZB and DG transactions may proceed electronically as normal.
TOP