×

Ref No: DNT/MAB/20210511-001

Dear Valued Customers,

Warmest greetings from Dagang Net Technologies Sdn Bhd.

NOTIFICATION - INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that Building Services – Ancillary Building Engineering Division will be carrying out the Genset ON Load Test at FCZ Building, KLIA from Sunday, 23 May 2021 (1000hrs until 1700hrs). No Normal Supply within 1 hour and Essential Power Supply will be available after 10 seconds.

For further information on the above, please refer to the attached circular from Malaysia Airports (Sepang) Sdn Bhd / MA Sepang:

Should you require more information, please reach out to our Careline at 1 300 133 133 or email careline@dagangnet.com.

Thank You

Attachment:

Circular from Malaysia Airports (Sepang) Sdn Bhd / MA Sepang

Latest News

Get updates and announcements from Dagang Net

View All

Read more +23 July 2026

RESUMPTION OF SERVICE: SYSTEM ACCESSIBILITY – ePCO

Please be informed that the accessibility issue affecting the Electronic Preferential Certificate of Origin (ePCO) has been resolved. The system is now operating normally.
Read more +23 July 2026

NOTICE OF INTERMITTENT TECHNICAL ISSUES IMPACTING SYSTEM ACCESSIBILITY – ePCO

Please be informed that, due to technical issues, the following system are currently affected: Electronic Preferential Certificate of Origin (ePCO). Date: Thursday, 23 July 2026 Time/Duration: Until Further Notice Affected Communities: ePCO Users
Read more +09 July 2026

SYSTEM DOWNTIME NOTIFICATION: NEW EPERMIT SYSTEM

Please be informed that maintenance activities will be carried out for the New ePermit system. The details are as follows: Date: 11th July 2026 Time: 1500 hours – 1900 hours (3.00 pm – 7.00 pm) Duration: 4 Hours Affected link: https://newepermit.dagangnet.com.my This link will not be accessible during the downtime.
TOP