Ref No: DNT/MAB/20220905-001

Dear Valued Customers,

Warmest greetings from Dagang Net Technologies Sdn Bhd.

NOTIFICATION - INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that Building Services – Ancillary Building Engineering Division will be carrying out the Genset ON Load Test at FCZ Building, KLIA from Sunday, 11 September 2022 (1000hrs until 1700hrs). No Normal Supply within 1 hour and Essential Power Supply will be available after 10 seconds.

For further information on the above, please refer to the attached circular from Malaysia Airports (Sepang) Sdn Bhd / MA Sepang:

Should you require more information, please reach out to our Careline at 1 300 133 133 or email careline@dagangnet.com.

Thank You

 

Attachment

Circular from Malaysia Airports (Sepang) Sdn Bhd / MA Sepang

Latest News

Get updates and announcements from Dagang Net

View All

Read more +12 January 2026

SYSTEM DOWNTIME NOTIFICATION: NEW EPERMIT SYSTEM

Please be informed that maintenance activities will be carried out for the New ePermit system. The details are as follows: Date: 24th January 2026 (Saturday) Time: 1500 hours – 1800 hours (3.00 pm – 6.00 pm) Duration: 3 Hours Affected link: https://newepermit.dagangnet.com.my .This link will not be accessible during the downtime.
Read more +09 December 2025

DNeX appeals High Court’s decision on Dagang Net

Cyberjaya, 9 December 2025 – Dagang NeXchange Berhad (“DNeX”), in consultation with its external legal counsel, has filed an appeal to the Court of Appeal against the High Court decision handed down on 5 December 2025 on its wholly-owned subsidiary Dagang Net Technologies Sdn Bhd (“Dagang Net”).
Read more +03 December 2025

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 7th December 2025, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.
TOP