×

Dear Valued Customers,

Warmest greetings from Dagang Net Technologies Sdn Bhd.

NOTIFICATION : IMPLEMENTATION OF ELECTRONIC SIGNATURE AND SEAL THROUGH THE ePCO SYSTEM

Reference made to the attached announcement from Ministry of International Trade and Industry (MITI). MITI will implement electronic endorsement of the Preferential Certificate of Origin (PCO) by affixing electronic signature and official seal through the ePCO system. Effective from 13 April 2020, exporters will no longer need to be physically present at the MITI Service Counter for manual endorsement of the PCO as it will be done electronically.

This initiative will be implemented gradually starting with five (5) Free Trade Agreement (FTA) schemes, namely:

(i) Malaysia - Japan Economic Partnership Agreement (Form MJEPA);
(ii) The ASEAN - Australia - New Zealand Free Trade Area (Form AANZ);
(iii) ASEAN - Hong Kong Free Trade Agreement (Form AHK);
(iv) ASEAN - Korea Free Trade Agreement (Form AK); and
(v) ASEAN Trade in Goods Agreement (Form D)

Exporters are required to submit the duplicate copy of the PCO to MITI Service Counter at Menara MITI or MITI Regional Offices on a monthly basis.

Please refer to the attachment for further details.

Should you require more information, please reach out to our Careline at careline@dagangnet.com

Thank you.

Attachment:

Announcement by MITI

Latest News

Get updates and announcements from Dagang Net

View All

Read more +13 June 2025

ANNOUNCEMENT: IMPLEMENTATION OF NEW CONTROL MECHANISM FOR THE IMPORTATION OF WASTE PLASTIC (HS CODE 3915)

Please be informed that effective from 1 July 2025, the control mechanism for the importation of waste plastic (HS Code 3915) will shift from the issuance of Approved Permits by JPSPN to the Certificate of Approval (CoA) mechanism issued by SIRIM, as appointed by the Ministry of Investment, Trade and Industry (MITI).
Read more +11 June 2025

NOTIFICATION: SYSTEM DOWNTIME FOR ATIGA APPLICATIONS ON MALAYSIA’S ASEAN SINGLE WINDOW (ASW) GATEWAY DUE TO TECHNICAL DISRUPTION

Please be informed that due to a technical issue with Malaysia’s ASEAN Single Window (ASW) Gateway, the transmission and receipt of electronic Form D (e-Form D) under the ASEAN Trade in Goods Agreement (ATIGA) has been disrupted since 8 June 2025.
Read more +11 June 2025

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 15th June 2025, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.
TOP