×

Dear Valued Customers,

INSTRUCTION TO FILL IN AGENT INFORMATION IN ePERMIT SYSTEM

Warmest Greetings from Dagang Net Technologies Sdn Bhd

With reference to the attached letter from Department of Malaysian Quarantine and Inspection Services (MAQIS), please be informed that Agent Details column in ePermit system shall be mandatory effective 1st August 2018. This instruction applies to all permits issued by Department of Malaysian Quarantine and Inspection Services (MAQIS).

To avoid rejection or delay in permit issuance, please ensure Agent Details are completely filled in.

The official announcement is also made available at : https://newepermit.dagangnet.com.my/epermit/login/login.html and http://epermit.dagangnet.com/epermit.jsp

For further details, please contact our Careline at 1 300 133 133 or email to careline@dagangnet.com

Thank you.

Attachment:
Letter from MAQIS

Latest News

Get updates and announcements from Dagang Net

View All

Read more +13 June 2025

ANNOUNCEMENT: IMPLEMENTATION OF NEW CONTROL MECHANISM FOR THE IMPORTATION OF WASTE PLASTIC (HS CODE 3915)

Please be informed that effective from 1 July 2025, the control mechanism for the importation of waste plastic (HS Code 3915) will shift from the issuance of Approved Permits by JPSPN to the Certificate of Approval (CoA) mechanism issued by SIRIM, as appointed by the Ministry of Investment, Trade and Industry (MITI).
Read more +11 June 2025

NOTIFICATION: SYSTEM DOWNTIME FOR ATIGA APPLICATIONS ON MALAYSIA’S ASEAN SINGLE WINDOW (ASW) GATEWAY DUE TO TECHNICAL DISRUPTION

Please be informed that due to a technical issue with Malaysia’s ASEAN Single Window (ASW) Gateway, the transmission and receipt of electronic Form D (e-Form D) under the ASEAN Trade in Goods Agreement (ATIGA) has been disrupted since 8 June 2025.
Read more +11 June 2025

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 15th June 2025, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.
TOP