×

Cyberjaya, 11 April 2022 - Dagang NeXchange Berhad (“DNeX”), via its 90 percent-owned subsidiary Ping Petroleum Limited (“Ping”), has passed a key milestone after receiving a letter of “no objection” from the North Sea Transition Authority (“NSTA”) in relation to the company’s proposed development concept for the Avalon discovery in the Central North Sea, United Kingdom (“UK”).

Ping had last year announced the purchase of the remaining 50 per cent interest in UK North Sea Block 21/6b, License P.2006, containing the Avalon Oil Development from Summit Exploration and Production Limited, a wholly-owned subsidiary of Sumitomo Corporation, bringing Ping’s ownership in the licence to 100 per cent.

The company will now finalise conceptual development planning and begin Front End Engineering works in preparation to submit the Avalon Field Development Plan, with Final Investment Decision (“FID”) anticipated later this year.

With a total estimated recovery of 23 million barrels of oil, production from Ping’s second oilfield asset is scheduled to begin between mid 2024 and mid 2025, subject to availability of key materials and equipment.

Tan Sri Syed Zainal Abidin Syed Mohamed Tahir, Group Managing Director of DNeX, said that receiving “no objection” to the proposed development concept represents a material opportunity to expand and diversify Ping’s portfolio of oil assets in full accordance with the UK’s production and emissions-reduction targets.

He said the concept comprises tie-back of Avalon production wells to a re-used Floating Production Storage and Offloading facility (“FPSO”), which has spare ullage to provide an offtake route for nearby stranded discoveries. He added that discussions are ongoing with the UK regulator and supply chain to decarbonise the development through integration with Floating Offshore Wind.

“The next step for Ping is to submit the company’s field development plan for Avalon to NSTA by the next quarter. Once approval is attained, the company will proceed with the full development programme” said Tan Sri Syed Zainal Abidin Syed Mohamed Tahir.

He said the Avalon field is planned to produce at initial rates of 20, 000 barrels of oil per day, providing a material increase in production and diversifying the asset base.

Latest News

Get updates and announcements from Dagang Net

View All

Read more +15 May 2026

NOTIFICATION: INTERRUPTION OF POWER SUPPLY AT CUSTOM 11KV SUBSTATION (CUS), KLIA

Please be informed that the EPS Engineering Division will be carrying out corrective maintenance works for the TX at the Custom 11kV Substation (CUS), FCZ Building, KLIA, on Sunday, 17 May 2026, from 10:00 AM to 5:00 PM. For further information, please refer to the attached circular from Cargo Management FCZ.
Read more +15 May 2026

ANNOUNCEMENT: TEMPORARY CLOSURE OF MITI ePCO AND ePERMIT SYSTEM DURING EID Al-ADHA 2026

In conjunction with the 2026 Eid Al-Adha celebration, the ePCO and ePERMIT systems under MITI will be temporarily closed and will resume operations according to the schedule below: Date of The Eid Al-Adha: 27 May 2026 (Wednesday) MITI’s Office: Kuala Lumpur, Perak, Pulau Pinang, Johor, Pahang, Kelantan, Melaka, Sabah and Sarawak Date and Time of The System Closure: 27 May 2026 (Wednesday) from 12.00 am until 29 May 2026 (Friday) 7.59 am Date and Time of The System Resume Operation: 29 May 2026 (Friday) at 8.00 am
Read more +30 April 2026

ANNOUNCEMENT: IMPLEMENTATION OF PRODUCT SPECIFIC RULES (PSR) UNDER AKFTA (HS 2022)

Please be informed that the Ministry of Investment, Trade and Industry (MITI) will implement the updated Product Specific Rules (PSR) under the ASEAN–Korea Free Trade Area (AKFTA), in line with the transition from HS 2017 to HS 2022, effective 1 May 2026.
TOP