×

Ref No: DNT/UCUS/20201214-01

Dear Valued Customers,

Warmest greetings from Dagang Net Technologies Sdn Bhd.

NOTICE ON uCUSTOMS UNAVAILABILITY FOR UNSPECIFIED PERIOD OF TIME

Reference is made to the letter from the Royal Malaysian Customs Department (RMCD) on the above, as attached.

Please be noted that RMCD will shutdown the uCustoms system for unspecified period of time. Following is the advice from RMCD with regards to the shutdown of uCustoms:

1. All declarations to RMCD for modules such as Journey, Manifest & Customs Declaration (K1/K2) that are currently being submitted to uCustoms are required to revert to SMK format beginning from 20th December 2020.
2. All declarations already submitted to uCustoms before or by 19th December 2020 must be completed by 30th December 2020.

Dagang Net Technologies Sdn Bhd (Dagang Net) will issue notice on the above from time to time upon receiving latest updates from RMCD.

Should you require more information, please reach out to our Careline at 1 300 133 133 or email careline@dagangnet.com.

Thank You

Attachment:

Letter from the Royal Malaysian Customs Department (RMCD)

Latest News

Get updates and announcements from Dagang Net

View All

Read more +13 June 2025

ANNOUNCEMENT: IMPLEMENTATION OF NEW CONTROL MECHANISM FOR THE IMPORTATION OF WASTE PLASTIC (HS CODE 3915)

Please be informed that effective from 1 July 2025, the control mechanism for the importation of waste plastic (HS Code 3915) will shift from the issuance of Approved Permits by JPSPN to the Certificate of Approval (CoA) mechanism issued by SIRIM, as appointed by the Ministry of Investment, Trade and Industry (MITI).
Read more +11 June 2025

NOTIFICATION: SYSTEM DOWNTIME FOR ATIGA APPLICATIONS ON MALAYSIA’S ASEAN SINGLE WINDOW (ASW) GATEWAY DUE TO TECHNICAL DISRUPTION

Please be informed that due to a technical issue with Malaysia’s ASEAN Single Window (ASW) Gateway, the transmission and receipt of electronic Form D (e-Form D) under the ASEAN Trade in Goods Agreement (ATIGA) has been disrupted since 8 June 2025.
Read more +11 June 2025

NOTIFICATION: INTERUPTION OF POWER SUPPLY DUE TO GENSET ON LOAD TEST AT FCZ BUILDING, KLIA

Please be informed that the Building Services (Ancillary) Engineering Division will be conducting a Genset On-Load Test at the FCZ Building, KLIA, on Sunday, 15th June 2025, from 10:00 AM to 5:00 PM. During this period, there will be no normal power supply for a duration of 1 hour. However, the essential power supply will be available within 10 seconds.
TOP